Who it’s for

For new build teams

From first fit-out
to owner handover.

Track what is built, fitted, commissioned and accepted on the arrangement itself, and carry the same file into the warranty period instead of starting again.

No signup needed for the demo. Nothing to install.

BUILT AROUND YOUR WORK.

Built for a project measured in years

Where the team changes but the drawing does not.

Explore the toolkit

One file, whole project

The markup you start during fit-out is the markup you hand over, and the one warranty defects get added to afterwards.

Survives handovers

Project managers rotate. The file carries the full picture without a handover meeting to explain the colour scheme - the legend is in it.

Deck by deck

A multi-deck arrangement stays one project. Zoom into a compartment, mark it, zoom back out to the whole boat.

Snagged is its own colour

Fitted and snagged is a different state from not fitted. Distinguishing them stops the same item being chased twice.

Nothing on anyone’s server

A new build GA is among the most confidential drawings in the industry. It stays on your device, full stop.

Offline by default

Installable, works with no connection, autosaves as you go. Yards are not known for their wifi.

DRAWING. MARKUP. REPORT.

A simple way
to keep work clear.

OPEN

Start with your GA.

Open your drawing, or pick up a saved YachtTracer project.

MARK

Give it context.

Mark zones, name your colours and keep the detail on the drawing.

SHARE

Send a clear picture.

Export a PDF for the people who need to see the work. Saving and PDF export require a plan.

GOOD TO KNOW.

A few questions,
answered.

Have something else in mind?
Talk to us

Can we start before the boat exists?

Yes - all you need is the arrangement drawing. Teams commonly start marking up planned scope well before there is anything physical to inspect.

Does it carry through into warranty?

Yes. Keep the same project drawing and rename the colour slots for warranty statuses after delivery. Save a separate project file and PDF first if you want to keep a record of the build at handover.

Can the yard and the owner’s team both use it?

Both, independently - and that is usually the better arrangement. Each side keeps its own file and its own view, and the exported PDF is what passes between them. Nobody is editing the other’s list, so there is never a question about who changed what, and neither side has to license the other to read a report.

SEE IT FOR YOURSELF.

Your drawing.
A clearer working day.

Open the real demo and try the tools on a plan.